[9] 隋海波,施斌,张丹,王宝军,魏广庆,朴春德,基于BOTDR的锚杆拉拔试验研究,岩土工程学报,2008,30(5):755-759(BOTDR-based pull out tests on anchor bolts,Chinese Journal of Geotechnical Engineering,2008,30(5):755-759.)【EI
Lai Hanjiang, Zheng Junjie, Zhang Jun, Zhang RongJun, Cui Lan. DEM analysis of “soil”-arching within geogrid-reinforced and unreinforced pile-supported embankments. Computers and Geotechnics. 2014,61, 23-23.